RCT Successfully Cut 5in Drill Pipe

Overview ObjectiveCut 5.0” Drill pipe at free point. ChallengesCoated pipe with TK34P component.Open ended BHA introducing uncertainty to the punched holes confirmation.SolutionsPerformed an integrated approach with Wireline Free Point Tool.ResultZERO HSE…

Continue Reading RCT Successfully Cut 5in Drill Pipe

Slim RCT Cut 1.5” Coiled Tubing Stuck During Milling Operation at Offshore Location

Overview Objective1.5" Coiled Tubing RecoveryChallenges81in ID minimum restrictionSolutions75” RCT and PTC deployed with E-Line running gearResultZero HSE Incident100% efficencyThe coil tubing was successfully cut & recovered. Details An Oil &…

Continue Reading Slim RCT Cut 1.5” Coiled Tubing Stuck During Milling Operation at Offshore Location

1” Radial Cutting Torch Cut Stuck Coiled Tubing Under Compression After One Year of Operation Suspension

Overview Challenges2” Coiled Tubing Stuck at 3,800mDeviation 10.95 Deg ̊5 ppg Brine3668psi @ 1720mTemperature 205 ̊ FMin Restriction 1.06 inchContinuos pressure surface pressure built upStringent Lithuim battery importation regulationsCT suspected…

Continue Reading 1” Radial Cutting Torch Cut Stuck Coiled Tubing Under Compression After One Year of Operation Suspension

Successfully Cut 3.5″ Tubing In Between Two Packers for Workover Operation

Overview ChallengesCutting depth was located between two production packers.5” 9.2 # N-80 Tubing under compressionMin restriction of 2.81inSuspected tubing are BucklingThree unssuccsesful mechanical cutter attemptsSolutionsDeployed 2.0in RCT and 1 11/16”…

Continue Reading Successfully Cut 3.5″ Tubing In Between Two Packers for Workover Operation

Rapid Deployment of Memory PTC Puncher on Coiled Tubing Reinstate Back Gas Well Production as Main Supply for Gas Injector Well

Overview Challenges Highly deviated well (77 degree) Coil tubing memory conveyance Required minimum flow area of 3.8-sqinch Solutions Non-explosive puncher on memory conveyance Details One of major oil and gas…

Continue Reading Rapid Deployment of Memory PTC Puncher on Coiled Tubing Reinstate Back Gas Well Production as Main Supply for Gas Injector Well

Rapid Mobilisation of Non-Explosive Puncher Enable Customer to Complete Cement Squeeze Operation at Remote Offshore Location

Overview ChallengesRestriction of 3.313” IDSlickline / memory conveyanceChallenging to mobilise explosive in countryUnknown well historySolutionsNon-explosive puncher on memory coveyance Details Over 40 fruitful years of oil production, the wells have…

Continue Reading Rapid Mobilisation of Non-Explosive Puncher Enable Customer to Complete Cement Squeeze Operation at Remote Offshore Location

Successful 2″ Coil Tubing Recovery in Natuna Sea

Overview Challenges•  2" Coil Tubing stuck due to runaway after cement job•  Top of cement 9,950ftMD•  45.56 Deg deviation•  No circulation•  8.3ppg fluid•  Restricted rig up heightsSolutions•  PTC/RCT deployed utilizing…

Continue Reading Successful 2″ Coil Tubing Recovery in Natuna Sea

Successful Cutting 2-7/8” End of Tubing using Non Explosive Radial Cutting Torch in Tandem with Electromechanical Anchor in Oil Well

Overview Challenges•  To cut 2-7/8” tail pipe below packer•  27 Deg deviation•  Narrow cutting window (1 meter)•  Required a clean cut•  High Profile WellSolutions•  Evaluate the EOT condition with downhole…

Continue Reading Successful Cutting 2-7/8” End of Tubing using Non Explosive Radial Cutting Torch in Tandem with Electromechanical Anchor in Oil Well