Rapid Mobilisation of Non-Explosive Puncher Enable Customer to Complete Cement Squeeze Operation at Remote Offshore Location

Overview ChallengesRestriction of 3.313” IDSlickline / memory conveyanceChallenging to mobilise explosive in countryUnknown well historySolutionsNon-explosive puncher on memory coveyance Details Over 40 fruitful years of oil production, the wells have…

Continue Reading Rapid Mobilisation of Non-Explosive Puncher Enable Customer to Complete Cement Squeeze Operation at Remote Offshore Location

Successful 2″ Coil Tubing Recovery in Natuna Sea

Overview Challenges•  2" Coil Tubing stuck due to runaway after cement job•  Top of cement 9,950ftMD•  45.56 Deg deviation•  No circulation•  8.3ppg fluid•  Restricted rig up heightsSolutions•  PTC/RCT deployed utilizing…

Continue Reading Successful 2″ Coil Tubing Recovery in Natuna Sea

Successful Cutting 2-7/8” End of Tubing using Non Explosive Radial Cutting Torch in Tandem with Electromechanical Anchor in Oil Well

Overview Challenges•  To cut 2-7/8” tail pipe below packer•  27 Deg deviation•  Narrow cutting window (1 meter)•  Required a clean cut•  High Profile WellSolutions•  Evaluate the EOT condition with downhole…

Continue Reading Successful Cutting 2-7/8” End of Tubing using Non Explosive Radial Cutting Torch in Tandem with Electromechanical Anchor in Oil Well

Success Story: Wireline Intervention Sub (WIS) Enabled Open Hole Formation Evaluation In Pressurized Mud Cap Wireline Logging

Overview ChallengesCritical formation evaluation dataHigh potential for mud lossesWell ControlContingency to pipe stuckSolutionsSafe and Simple Rig UpSmall foot print10Kpsi pressure ratingEliminate Long BailsNo additional crew to operate WISSuccessful ResultsZERO HSE…

Continue Reading Success Story: Wireline Intervention Sub (WIS) Enabled Open Hole Formation Evaluation In Pressurized Mud Cap Wireline Logging

Successful Non Explosive Radial Cutting Torch and Perforating Torch Cutter Operation to Cut 1.75” Coiled Tubing in Challenging Condition

Overview  Challenges1 ¾ inch Coiled Tubing Stuck at 3488m77Deg Deviation welltemperature 302deg FCT stucked across main reservoirUnknown free point depthTraces of cement outside the CTLimited overpull capacitySolutionsRFM run on slicklineIntroduce…

Continue Reading Successful Non Explosive Radial Cutting Torch and Perforating Torch Cutter Operation to Cut 1.75” Coiled Tubing in Challenging Condition

OTC Asia 2016 Paper Presentation: 26531 Continuous Sand Separation Technique: Paving Way for Future Sand Management

Petronas, BRI Cleanup and Daya Maxflo will be presenting a paper at OTC Asia 2016 at 24-March-2016 Paper Number 26531 : Continuous Sand Separation Technique : Paving Way for Future Sand…

Continue Reading OTC Asia 2016 Paper Presentation: 26531 Continuous Sand Separation Technique: Paving Way for Future Sand Management

SPE Presentation APOGCE Bali 2015

We are pleased to present the joint paper together with Petronas Carigali and BRI Clean Up AS  for the successful job (Dynamic Desander project) Paper Reference Number: SPE-176139-MS Ttile :…

Continue Reading SPE Presentation APOGCE Bali 2015