RCT Successfully Cut 5in Drill Pipe

Overview ObjectiveCut 5.0” Drill pipe at free point. ChallengesCoated pipe with TK34P component.Open ended BHA introducing uncertainty to the punched holes confirmation.SolutionsPerformed an integrated approach with Wireline Free Point Tool.ResultZERO HSE…

Continue Reading RCT Successfully Cut 5in Drill Pipe

Slim RCT Cut 1.5” Coiled Tubing Stuck During Milling Operation at Offshore Location

Overview Objective1.5" Coiled Tubing RecoveryChallenges81in ID minimum restrictionSolutions75” RCT and PTC deployed with E-Line running gearResultZero HSE Incident100% efficencyThe coil tubing was successfully cut & recovered. Details An Oil &…

Continue Reading Slim RCT Cut 1.5” Coiled Tubing Stuck During Milling Operation at Offshore Location

Daya Maxflo won Golden Bull Award 2020

  • Post Author:
  • Post Category:News

PETALING JAYA, 5 September 2020 – We are blessed and honoured to receive the 2020 Golden Bull Outstanding SME Award. This award certainly belonged to the Daya Maxflo team. Thanks their…

Continue Reading Daya Maxflo won Golden Bull Award 2020

Wireline Cable Protection Enabled a Safe and Efficient Formation Evaluation Programme On a Highly Challenging Well In Asia

Overview ObjectiveTo perform reservoir sampling on wireline in a 674 m 5 deg deviated open hole section.ChallengesSevere wireline cable sticking from past experienceMultiple sands in the dogleg with approx. 1,000…

Continue Reading Wireline Cable Protection Enabled a Safe and Efficient Formation Evaluation Programme On a Highly Challenging Well In Asia

1” Radial Cutting Torch Cut Stuck Coiled Tubing Under Compression After One Year of Operation Suspension

Overview Challenges2” Coiled Tubing Stuck at 3,800mDeviation 10.95 Deg ̊5 ppg Brine3668psi @ 1720mTemperature 205 ̊ FMin Restriction 1.06 inchContinuos pressure surface pressure built upStringent Lithuim battery importation regulationsCT suspected…

Continue Reading 1” Radial Cutting Torch Cut Stuck Coiled Tubing Under Compression After One Year of Operation Suspension

Successfully Cut 3.5″ Tubing In Between Two Packers for Workover Operation

Overview ChallengesCutting depth was located between two production packers.5” 9.2 # N-80 Tubing under compressionMin restriction of 2.81inSuspected tubing are BucklingThree unssuccsesful mechanical cutter attemptsSolutionsDeployed 2.0in RCT and 1 11/16”…

Continue Reading Successfully Cut 3.5″ Tubing In Between Two Packers for Workover Operation